Newhouse Academy School

Newhouse Academy School
LOCATION
Greater Manchester, Heywood
YEAR
2014 and 2024
CLIENT
WMB mechanical LTD
FACILITY
Siddal moor high school / New house academy
THE FIRST STAGE
-
The work was half the school — the "Boomerang" part of the school — consisting of 3 floors of classrooms, offices, WCs, etc.
-
We've designed, installed, and wired all the mechanical and wet plant throughout the building and fully upgraded the old system to a new BMS system.
-
Monitored systems: electric, water, gas, heat meter, air plant monitoring.
-
All major HVAC equipment: air handling units, heating, chilled water, DHWS immersion, CO₂ monitoring, natural ventilation systems, pump sets, full building automation, external lighting, and alarm system.
-
Full online site-wide BMS system and a front-end graphics package, upgrading the existing system to the new central supervisor.
THE SECOND STAGE
-
The other half of the school was knocked down and rebuilt, including an upgrade of the original systems.
-
A full new plant room, external plant, and air plant were installed to suit the new building design.
-
The front-end supervisor was upgraded for integration with the central BMS supervisor.