Newhouse Academy School

Image-1-3.jpg.webp

Newhouse Academy School

LOCATION

Greater Manchester, Heywood

YEAR

2014 and 2024

CLIENT

WMB mechanical LTD

FACILITY

​Siddal moor high school / New house academy

THE FIRST STAGE

  • The work was half the school — the "Boomerang" part of the school — consisting of 3 floors of classrooms, offices, WCs, etc.

  • We've designed, installed, and wired all the mechanical and wet plant throughout the building and fully upgraded the old system to a new BMS system.

  • Monitored systems: electric, water, gas, heat meter, air plant monitoring.

  • All major HVAC equipment: air handling units, heating, chilled water, DHWS immersion, CO₂ monitoring, natural ventilation systems, pump sets, full building automation, external lighting, and alarm system.

  • Full online site-wide BMS system and a front-end graphics package, upgrading the existing system to the new central supervisor.

THE SECOND STAGE

  • The other half of the school was knocked down and rebuilt, including an upgrade of the original systems.

  • A full new plant room, external plant, and air plant were installed to suit the new building design.

  • The front-end supervisor was upgraded for integration with the central BMS supervisor.

Recent Building Automation Projects | Manchester & UK | Syntax Controls

CONTACT US

Reach out with any
questions or inquiries

LOCATION

Based in the North West, we operate throughout Greater Manchester and surrounding areas across the UK.

PHONE

0161 564 8707

EMAIL

  • LinkedIn

© 2025 by Syntax Controls ltd.

bottom of page